Equipment sourcing

Tell us what you need. We'll find it, often faster than your current lead time.

Transformers, switchgear and batteries can be backordered for many months. We search our supplier network for stock that ships sooner, or an equivalent that meets your spec.

We source from Tier 1 suppliers and leading manufacturers.

Lead times, solved

The standard lead time isn't the only option. We find the best available option and say so plainly.

Key equipment can sit on backorder for over a year. Depending on your spec and how flexible you can be, we can often find something that ships sooner. Every quote shows real lead times, so you can plan around the truth instead of a hopeful date.

  1. Standard lead time

  2. 01

    Stock that ships sooner

    We search our supplier network for equipment that is already built or already in the queue.

  3. 02

    An equivalent that meets the spec

    When your first choice is stuck, we look for a comparable product from another qualified manufacturer.

  4. 03

    A different configuration

    Sometimes a different rating or two smaller units ship sooner than the one on your drawing. We flag it, and your engineer decides.

Illustration only. Real lead times depend on the equipment, your spec and how flexible you can be. Every quote shows them.

For procurement teams

An extra set of hands for your procurement team. We do the legwork and come back with options.

Modules500,000+

modules available to U.S. projects

Manufacturers100+

manufacturers we source

Purchase orders1 PO

for every component

Typical industry wait, July 2026160 weeks

Lead time for generator step-up transformers by the first quarter of 2026.

Typical industry wait, July 2026125 weeks

Lead time for high-voltage circuit breakers in the second half of 2025.

Source: Wood Mackenzie, reported by Reuters, July 9, 2026. Figures are for utility-grade equipment.

How it works

From your list to your job site in five steps

Your site or warehouse
  1. Stop 01

    Send your list

    A BOM, a spec sheet, or just a message.

  2. Stop 02

    We source and quote

    We search our supplier network and send options with lead times, including faster ones when your spec allows.

  3. Stop 03

    You issue a purchase order

    Pick the option that fits and place your order.

  4. Stop 04

    It ships

    We handle logistics to your site or warehouse.

  5. Stop 05

    We track it

    We follow your order until it's delivered.

Not sure what to send? A message is enough to start.

Who we supply

  • Installers
  • EPCs
  • Developers
  • Distributors
  • Independent power producers
  • Utilities and co-ops
  • Data center developers

Delivered to you.

We coordinate delivery to your job site or warehouse.

Small orders too.

Smaller boxed orders are available for many products.

Need somewhere to hold it?

We have storage options.

Solar brands we source include

  • Canadian Solar
  • Trina Solar
  • JA Solar
  • Jinko Solar
  • LONGi
  • REC
  • Qcells
  • First Solar
  • Silfab
  • SMA
  • SolarEdge
  • Enphase
  • Sungrow
  • Fronius
  • Sol-Ark

Brand names belong to their owners. Listing a brand does not mean the brand endorses BNB Energy.

Monitoring and controls

See your site. Control what it sends to the grid.

Site gateways collect data from inverters and meters. A cloud portal shows how the system is running. Non-export control stops a commercial solar system from sending power onto the grid where the utility does not allow it.

  • Site gateways
  • Cloud monitoring portal
  • Non-export control
Ask about monitoring

Send your list. We'll find it.

A BOM, a spec sheet or a short message is enough. Tell us what you need and where it's going.

Building a data center? Start here Or call (951) 499-1557

What we source

Top categories. If it's on your BOM, ask.

  1. 01Solar modulesThe panels that turn sunlight into electricity
  2. 02InvertersConvert the panels' DC power into AC power the grid and buildings use
  3. 03Racking and trackersThe metal structures that hold panels. Trackers tilt to follow the sun
  4. 04Battery storage (BESS)Store energy to use later, from cabinet size to utility-scale containers
  5. 05TransformersStep voltage up or down so power can move between equipment and the grid
  6. 06SwitchgearThe large switches and breakers that route and protect power
  7. 07GeneratorsBackup power when the grid or solar is unavailable
  8. 08Monitoring and controlsSite gateways and software that monitor a system and control how much power it exports
  9. 09Data center equipmentPower, cooling, modular units and compute. GPUs, CPUs and servers are sourced on request, never stocked
  10. 10Something elseTell us what you need. If it's on your BOM, we can look for it

We source from Tier 1 suppliers and leading manufacturers. Don't see it here? Send the list anyway.

IRA- and FEOC-compliant options available.

Request a Quote