Data centers

Land, power and equipment for data center developers.

Power is what slows data center projects down. Tell us the megawatts, the location and the timeline. We search our network of sites, power and suppliers.

Building now and need equipment? Request a quote

Prefer to talk?

Phone (951) 499-1557

Email ben@bnb-energy.com

Data center
complexities, solved

A site is not powered just because a line runs nearby. It is powered when a utility can deliver the megawatts, to a known point, on a date that fits your schedule.

Land that looks right on a map can miss that test, and so can equipment that arrives after the schedule has moved. We work on both ends.

I need a site or power

Pain points we know well

Source: Wood Mackenzie, reported by Reuters, July 9, 2026. Figures are for utility-grade equipment.

What we do

Three ways we help a data center project.

  • For developers

    Offering 01

    Land and site sourcing

    We look for land that suits a data center: enough acreage, close to power lines or a substation, and the right zoning.

  • Developers and owners

    Offering 02

    Power and site introductions

    We know owners and projects with powered land, and we introduce them to developers who need it. Introductions support the equipment we source for the build.

  • Developers and builders

    Offering 03

    Equipment for the build

    We source from all Tier 1 suppliers, so the power, cooling and compute equipment a data center needs is covered.

How it works

The same four steps from either side.

Building on your land? We source equipment from all Tier 1 suppliers.

Request a quote

Top equipment categories

Power, compute and cooling, sourced for your schedule.

We source from all Tier 1 suppliers. Send a BOM, a spec sheet or a short message. A rough list is enough.

Suppliers we source from include

  • Supplier logo 1
  • Supplier logo 2
  • Supplier logo 3
  • Supplier logo 4
  • Supplier logo 5
  • Supplier logo 6
  • Supplier logo 7
  • Supplier logo 8
  • Supplier logo 9
  • Supplier logo 10
  • Supplier logo 11
  • Supplier logo 12
  • Supplier logo 13
  • Supplier logo 14
  • Supplier logo 15
  • Supplier logo 16
  • Supplier logo 17
  • Supplier logo 18
  • Supplier logo 19
  • Supplier logo 20

Need a site or power instead? Open this form.

For developers

I need a site or power

Tell us what you are building. A rough number and a region are enough to start the search.

The more you tell us, the faster we search

  • The megawatts you need (a range is fine)
  • Where: a state, county or region, or a short list
  • When you need power or the site
  • Whether any power is already secured
  • How many acres you need, or "not sure"
  • Anything that rules a site out, such as flood zone, water, fiber or zoning
Introductions happen under an NDA. Nothing you send is published.

Prefer to talk?
Phone (951) 499-1557
Email ben@bnb-energy.com

A range is fine, such as 20 to 50.

State, county or region. A short list is fine.

Or "not sure."

Anything that rules a site out, equipment you need, or other context.

Only if you would rather talk it through.

Upload a site brief or spec (optional)

PDF or Word, up to 5 files and 10 MB each. Over 10 MB? Email ben@bnb-energy.com.

    We will only use this to respond to your request. Privacy policy

    Need equipment instead? Request a quote Have land or power instead? Start here

    Have land or power instead? Open this form.

    For landowners and project owners

    I have land or power

    If you own land, a powered site or a project that needs a buyer or tenant, tell us what you have. We will tell you plainly whether it fits.

    A county is enough. Your exact address can wait until after an NDA.

    An estimate is fine.

    Leave blank if you are not sure.

    Anything else that would help us judge fit.

    Upload a survey or site map (optional)

    PDF or Word, up to 5 files and 10 MB each. Over 10 MB? Email ben@bnb-energy.com.

      We will only use this to respond to your request. Privacy policy

      Need a site or power instead? Start here Need equipment? Request a quote

      What makes land attractive to data center developers

      Power
      Close to a high-voltage line or substation, with megawatts the utility can actually deliver, and a realistic date.
      Acreage
      Hyperscale campuses often need tens of acres. Smaller edge sites need far less.
      Zoning
      Industrial or commercial zoning is easier. Farmland may need rezoning.
      Fiber
      More than one carrier route nearby.
      Water
      Matters for some cooling designs, less for others.
      Flood zone
      A flood zone usually rules a site out.

      You do not need to know all of this. Tell us what you know.

      What happens next

      1. You tell us what you have.
      2. We check whether it fits what developers are asking for.
      3. If it does, we ask your permission before any introduction.
      4. Introductions happen under an NDA.
      What we do not doWe do not publish listings, quote prices or promise a buyer.

      Prefer to talk?
      Phone (951) 499-1557
      Email ben@bnb-energy.com

      Your information stays yours.

      Privacy policy
      • We do not publish names, locations or sizes.
      • We ask before we introduce you to anyone.
      • Details change hands only under an NDA.

      FAQ

      Questions data center teams ask first.

      Request a Quote

      Land where a utility can deliver the megawatts a data center needs, to a known point, by a date that fits the schedule. Being near a power line is not enough.

      If you need a site or power: the megawatts, the location and the timeline. If you have land or power: what you have, where it is, and what you know about its power. A rough note is enough.

      Power comes first, then acreage, zoning, fiber, water and flood zone. Tell us what you know and we will tell you plainly whether it fits.

      BNB does not build projects itself. We work with national EPC partners who design and build, and we source the equipment.

      No one without your permission. Details are shared only after you agree to an introduction, and under NDA.

      Every size, from a few megawatts to hyperscale campuses. Tell us what you need and we'll tell you plainly how we can help.

      Transformers, switchgear and generators. Data center power and cooling equipment, including UPS, PDUs, CDUs and chillers. Modular data centers. GPUs and compute, including CPUs and servers, sourced on request. Fire suppression.

      Often, yes. It depends on what you need and how flexible you can be. If you can take an equivalent unit from another manufacturer, a different rating or configuration, or equipment that's already built, we can often find something that ships sooner. Every quote shows the lead time so you can compare.

      Yes. If you need to store material before it goes to your site, we can help. Tell us what you need to store, how much and for how long, and we will come back with options.

      Equipment: every quote shows a lead time, and we look for options that ship sooner. Sites and power: the utility decides most of that timeline, and we tell you plainly what we find.

      We introduce projects to lenders and equity partners. BNB is not a lender. See Capital and Development.

      Tell us what you need, or what you have. We'll start looking.

      A rough number and a region are enough to start.

      16192 Coastal Highway
      Lewes, DE 19958

      (951) 499-1557

      Stay informed

      BNB Energy Weekly: one short email on the changes that affect your projects.